Projects · Perth, Scotland

Solar Farm Groundworks

4,000 metres of drainage landed on the X2 solar farms in Perth, Scotland.

NRSWA QualifiedFull Plant FleetCPCS, NPORS, and SMSTS Qualified

RW Groundworks

4,000 Metres of Drainage on the X2 Solar Farms

RW Groundworks has landed 4,000 metres of drainage on the X2 solar farms in Perth, Scotland. The drainage runs between the solar panel rows, dug and laid by our crew from Helston, Cornwall.

  • SiteX2 solar farms
  • LocationPerth, Scotland
  • WorkDrainage
  • Installed4,000 metres
Get Free Quote →
Drainage trench cut between two rows of solar panels at the X2 solar farms

On Site

Project Gallery

Photos from the X2 solar farms in Perth.

Drainage trench running between the solar panel rows at the X2 solar farms, Perth
Drainage trench cut between two rows of solar panels
Volvo excavator digging a deep drainage trench on the solar farm
Excavator cutting a drainage run across the site
Two operatives standing by the excavator on the solar farm
Drainage trench with orange safety fencing beside the solar panels
Drainage trench beside the solar panel rows
Site team in hi-vis walking the haul road between the panels
RW Groundworks van parked at the solar farm site gate
Site meeting on the solar farm
Solar farm site gate with safety signage
Welcome to Scotland sign on the drive north from Cornwall

RW Groundworks

Project Updates

4,000 metres of drainage landed on the X2 solar farms in Perth. Drone shots of the site are planned for the coming weeks.

Talk to Reuben: 07385 250920 →
 Helston

OPERATING HOURS

Office Hours:

Mon to Sun

9:00am - 5:00pm

Privacy Policy | Term & Condition | FAQ

Copyright © 2026 RW Groundworks. All rights reserved.