Flushing School

Playground Resurfacing at Flushing School

The brief: a worn, patched surface out and a new safety surface in, with access over a boundary wall and a fixed window before the children returned.

We stripped the old surface, craned in crushed stone over the wall, compacted a new sub-base and finished with blue wet-pour and the drain covers set flush. Drag the slider: both photos were taken from the same spot.

  • SiteFlushing School
  • LocationFlushing, Cornwall
  • WorkPlayground resurfacing
  • FinishBlue wet-pour, drain covers set flush
Get Free Quote →
Flushing School playground after: new blue wet-pour safety surface in front of the school
Flushing School playground before: the old green surface lifted in front of the school building
BeforeAfter

Gwinear Community Primary School

New Paving and Paths at Gwinear

Old slabs lifted where the grass had grown through the joints, a paved terrace the full length of the classrooms with handrail and steps, weed membrane and new paving to the fire door, and concrete paths run out across the playing field.

Done to a school’s timetable, with our own lorry and digger on site.

  • SiteGwinear Community Primary School
  • LocationGwinear, Cornwall
  • WorkPaved terrace, steps, paths
  • PlantOur own lorry and digger
Get Free Quote →
New paved terrace running the length of the classrooms at Gwinear Community Primary School

On Site

Project Gallery

Before, during and after at Flushing School and Gwinear Community Primary School.

Flushing School playground before: cracked, worn green surface with faded court markings
Old green playground surface being lifted in front of Flushing School
Crane lorry lifting crushed stone over the boundary wall into the Flushing School playground
New compacted stone sub-base across the Flushing School playground
Blue wet-pour safety surface finished up to the steps and blue store doors at Flushing School
Drain covers set flush in the new blue wet-pour at Flushing School
Finished blue wet-pour playground beside the school wall at Flushing School
New blue wet-pour laid through the side passage at Flushing School
Gwinear school before: old slabs with grass growing through the joints
Gwinear school before: cracked narrow path along the classroom
Gwinear school before: narrow, worn path running towards the school
New paved terrace along the classrooms at Gwinear Community Primary School
Paved terrace with handrail and steps down to the playing field at Gwinear Community Primary School
New paving to the fire door with a bark border at Gwinear Community Primary School
New concrete path across the playing field at Gwinear Community Primary School
New concrete path curving to the playground railings at Gwinear Community Primary School

Schools and Main Contractors

One Crew, Our Own Plant

We hold NRSWA, CPCS, NPORS and SMSTS across the team and run our own plant, which is what keeps a school job on programme. Schools, trusts and main contractors welcome.

Talk to Reuben: 07385 250920 →
 Helston

OPERATING HOURS

Office Hours:

Mon to Sun

9:00am - 5:00pm

Privacy Policy | Term & Condition | FAQ

Copyright © 2026 RW Groundworks. All rights reserved.